Installation
Overview
On
the day of installation the installation engineer will liaise
with your ICT Coordinator to confirm details
as per survey or what was agreed verbally.
The
interactive whiteboard will be fixed to the wall at the desired
location and height from the floor.
The
data cables from the interactive whiteboard to the PC will
run in trunking usually to the bottom right or bottom left
of the whiteboard in relation to the positioning of the lap
top or pc and terminates at the junction boxes at this location.
The
projector must be securely fixed to the ceiling of the room
using the appropriate mounting bracket. If a false ceiling
is present, a hole will be cut in the ceiling tile, a trim
plate fitted and a fixing pole of appropriate length passed
through and attached to the bracket above maximum length we
can install at is 3 meters . Typically, the bracket
is fixed so the projector is approximately 2.1 to 3.5 meters
from the interactive whiteboard. The projector will
be positioned no less than 2.4 meters from the floor and will
sit secured using the appropriate fixing plate to the pole
mount.
The
data cables from the projector will either be contained in
trunking along the ceiling or out of sight above any false
ceiling. The cables will run vertically down the wall
in trunking to the termination boxes .
Speakers,
if ordered, will be mounted either side of the interactive
whiteboard. Cabling for the speakers will be run behind the
board, and will be routed through the existing trunking (used
for the whiteboard data cable) to the speaker
termination faceplate. The amplifier or Video will be
positioned close to the PC, laptop.
All
cabling will be securely contained in 16 mm x 25 mm white
trunking.
The
software for the interactive whiteboard will then be installed
on the PC or Lap Top , in order to demonstrate the operation
of the whiteboard, projector and the key elements of the
interactive
software. Please note, we do not install on to servers within
networks if this required you need the appropriate software
from the interactive board suppler and the administrator
is
required to be present. Once all elements of the installation
are finished, you will be requested for your signature
on our sign off form with any comments. This sign off
is to indicate that you are satisfied with the installation.