Installation Overview
On the day of installation the installation engineer will liaise
with your ICT Coordinator to confirm details as per survey or what was agreed
verbally.
The interactive whiteboard will be fixed to the wall at the desired
location and height from the floor.
The data cables from the interactive whiteboard to the PC will run in
trunking usually to the bottom right or bottom left of the whiteboard in
relation to the positioning of the lap top or pc and terminates at the junction
boxes at this location.
The projector must be securely fixed to the ceiling of the room
using the appropriate mounting bracket. If a false ceiling is present, a hole
will be cut in the ceiling tile, a trim plate fitted and a fixing pole of
appropriate length passed through and attached to the bracket above maximum
length we can install at is 2 meters . Typically, the bracket is fixed
so the projector is approximately 2.1 to 3.5 meters from the interactive
whiteboard. The projector will be positioned no less than 2.4 meters from the
floor and will sit secured using the appropriate fixing plate to the pole
mount.
The data cables from the projector will either be contained in
trunking along the ceiling or out of sight above any false ceiling. The cables
will run vertically down the wall in trunking to the termination boxes
.
Speakers, if ordered, will be mounted either side of the interactive
whiteboard. Cabling for the speakers will be run behind the board, and will be
routed through the existing trunking (used for the whiteboard data cable) to
the speaker termination faceplate. The amplifier or Video will be positioned
close to the PC, laptop.
All cabling will be securely contained in white
containment.
The software for the interactive whiteboard will then be installed on
the PC or Lap Top , in order to demonstrate the operation of the whiteboard,
projector and the key elements of the interactive software. Please note, we do
not install on to servers within networks if this required you need the
appropriate software from the interactive board suppler and the administrator
is required to be present. Once all elements of the installation are
finished, you will be requested for your signature on our sign off form with
any comments. This sign off is to indicate that you are satisfied with the
installation.